Monday 19.02.07

12.00 - 15.00

Management

- Global Project Management Presentation

LPM + PO

PCA

PCA

Gratama

- Local Project Management Presentation (PCB) - (10 min / Institute)

LPM

15.00 -16.00

Feedbacks On Management

- Open discussion on the Project Management

LPM + PO

N/A

RBA

Gratama

16.00 - 18.00

RAMS Presentation

- RAMS Presentation

LPM, MLO

MLO

PCA

Gratama

- Verification Matrix

18.00 - 18.30

Debriefing

 

ALL

N/A

 

Gratama

 

 

 

 

 

 

 

 

Tuesday 20.02.07

9.00 - 12.30

Metrologie CDR3

- Conceptual Design Review on Metrology System

MLO, RBA, R.Stuik, S.Stroebele, SBN, FO optician

R.Stuik

MLO

Gratama

FO optician

9.00 - 12.30

CU - FO Mechanic CU/FO/IMS

CU presentation

Mechanics LAOMP, Mechanics IAG, PCA

TBD

PCA

201

FO presentation

ICD CU-FO-IMS

14.00 - 18.00

Quality

- Quality Management Plan presentation

PO + LPM + Quality correspondant

PCA (On behalf of L. Capoani)

PCA

201

- Configuration Control Plan Presentation

- Advitium Presentation

16.00 - 18.00

System Analysis and budget

- System Analysis & budget draft Presentation

MLO, RBA, JKO, Opticians, Mechanics

MLO

RBA

Gratama

18.00 - 18.30

Debriefing

 

ALL

N/A

 

201

 

 

 

 

 

 

 

 

Wednesday 21.02.07

9.00 - 12.00

DV Mechanics

Presentation DV

R.Reiss, JL Lizon, (PCA), RBA, CRAL Mechanics

J.L. Lizon

PCA

201

ICD DV-IFU

9.00 - 12.00

Global Muse Mechanics

- Global MUSE Design Presentation

Mechanics IAG, MLO, (PCA)

H. Nicklas

HNI

Gratama

- Earth quake analysis draft

14.00 - 18.00

Optical Design and Performance Review

- Review of CU, FO, SRO, IFU Optical Design and performance Report draft

MLO, JKO, Opticians

Opticians

JKO

201

14.00 - 17.00

Vacuum & Cryogenics System

VCS Design & Performance draft Presentation

R.Reiss, JL Lizon, PCA,  RBA, IAG Mechanics

J.L. Lizon

HNI

Gratama

-VCS/IMS ICD

IAG Mechanics

18.00 - 18.30

Debriefing

 

ALL

N/A

 

201

 

 

 

 

 

 

 

 

Thursday 22.02.07

9.00 - 12.00

IFU Mechanics

-IFU Mechanical Design Presentation

CRAL Mechanics, IAG Mechanics, PCA, MLO

Lyon Mechanics

ERE

Gratama

- IFU/IMS ICD

IAG Mechanics

9.00 - 12.30

ETC - Calibration Plan - OS

Review of:

APE, RBA, M/Roth, R.Mc Dermid, M.Franx, S.Brau Nogué, R.Stuik

Documents Writer

APE

201

- Calibration plan draft

- Operational concept draft

- ATC specification draft

- Control software user requirement draf

14.00 - 18.00

Electronics

Draft Electronic design report

SBN, JP Dupin, MLO, (PCA), M. Duchateau, R. Reiss, S. Stroebele

JP Dupin

SBN

Gratama

14.00 - 18.00

AIT S/S, Europe, Paranal

S/S MAIT Presentation

J.L. Lizon, F.Laurent, RBA, H. Nicklas, (PCA)

RBA, FLA, HNI

RBA

201

S/S AIT Europe

S/S AIT Paranal

18.00 - 18.30

Debriefing

 

ALL

 

 

201

19.30 - 22.00

Dinner

 

ALL

 

 

Malle Jan

 

 

 

 

 

 

 

 

Friday 23.02.07

9.00:      

Mechanics - H. Nicklas

 

 

 

201

           

2 x (10 min presentation + 20 min discussion)

 

 

 

10.00:     

Detectors - R. Reiss

 

 

 

 

           

15 min presentation + 30 min discussion

 

 

 

10.45:     

Electronics - S. Brau-Nogué

 

 

 

           

15 min presentation + 30 min discussion

 

 

 

11.30:     

Operation and Data Flow - A. Pecontal

 

 

 

           

15 min presentation + 30 min discussion

 

 

 

12.15:     

 Lunch

 

 

 

 

13.30:     

Interface with Galacsi and Metrology - M. Loupias (S. Stroebele)

 

 

 

           

15 min presentation + 30 min discussion

 

 

 

14.15:     

AOB (45 min)

 

 

 

 

 